Our Process - What to expect

Plans, financing, and permits

This stage is also referred to as the pre-construction stage. The amount of time needed to develop a complete set of plans, estimate the cost of the dwelling, arrange for financing and obtain a building permit and all other required approvals, will vary considerably across the country. Providing access to the building site and arranging for temporary power may also take place during this stage.
The vision begins

Layout of the new build

The first stage of construction involves layout of the building on the property. To properly observe the by-laws for setbacks to property lines, the services of a land surveyor may be required. Accurately laying out the excavation for the depth and placement of foundation is critical. Layout can usually be performed in a single day provided property boundaries do not need to be established. Site planning, on the other hand, to take advantage of the sun and wind, to manage drainage and snow accumulation, and to afford a pleasing view, may require considerably more effort.

02

03

Phase three

Excavation and footings

Once the building layout is complete, excavation for the foundations may proceed. A single day is often all that is needed, provided appropriate equipment is employed and there is access to the excavation area. Another few days are needed to trench for and rough-in services, form and pour footings, remove footing formwork, layout the foundation walls and columns, and prepare to construct the foundations.

Foundations, drainage, and backfill

Foundations can be installed in several days, including curing concrete and removing formwork. Damp proofing, foundation drainage systems and backfill will usually require another day or two. In some cases, unusual site conditions in unserviced areas may require additional measures for foundation drainage, such as sumps, ditching or dry wells. Properly storing topsoil and excavated material suitable for backfilling can eliminate the need to import fill and topsoil. Placement of the granular layer and basement floor slab usually takes place later when the basement plumbing rough-in is completed.

04

05

Phase five

Framing

The structural shell of a one- or two-storey house must be erected before any other work can begin. The shell consists of the foundation, floors, walls and roof. In some cases, interior walls may be load bearing, so they must be erected at the same time as the exterior walls. The shell must be framed and sheathed during construction to obtain its rigidity. Generally, temporary bracings and cross bracings are introduced to allow construction to proceed without accidents or damage.
Your new home begins to take form

Doors and windows

Installing doors and windows, usually after framing is completed, requires a few days to a week to complete. Complete installation generally includes flashing and installing locks and related hardware. Jamb extensions and trim are typically part of the finishing carpentry work. The interior air sealing of gaps around window and door openings is commonly performed by the insulation and air/vapour barrier contractor.

06

07

Phase seven

Plumbing, heating and electrical

This stage usually does not start until all framing is completed. Plumbing is brought from the service connections and roughed-in to the fixtures. Bathtubs and any large shower enclosures are generally installed at this time. The furnace and ductwork or piping is installed, along with ductwork for exhaust fans and mechanical ventilation equipment such as heat recovery ventilators (HRVs). Electrical wiring, smoke alarms, telephone and computer lines, and cable TV is roughed-in throughout the dwelling. The work requires about two weeks to complete, but does not include items such as woodstoves and fireplaces.
Phase eight

Exterior finishes

Depending on the type of exterior finish being applied to the dwelling, between one and two weeks is needed to complete this stage. If an exterior air barrier, such as a house wrap, is being used, it is usually applied at this time, but it may also have been installed during the framing stage. Brick, siding and stucco along with soffit, fascia, eavestroughing, downspouts, and window and door caulking are all part of the exterior finishes stage. Exterior trim and millwork, staining and painting may also be carried out at this stage.

08

09

Phase nine

Insulation, air and vapour barriers

This stage may be performed at the same time as exterior finishes, provided the insulation is protected against moisture damage caused by wind-driven rain. Installing insulation, air and vapour barriers requires a few days to complete when all of the detailing around penetrations, fixtures and outlets is included.
Phase ten

Interior finishes

This stage typically begins with installing ceiling, wall and floor finishes. Finishing carpentry for interior doors, frames and trim along with stair balusters and handrails is generally carried out immediately after the floor, wall and ceiling finishes are prepared for painting and varnishing. The interior finishes stage normally requires about two weeks to complete, but significantly more time may be required depending on the type of finishes selected.

10

11

The final touches

Paint, cabinet and fixtures

Painting and varnishing are usually performed at the beginning of this stage. Cabinets and items such as ceramic tile backsplashes are then installed. While this is proceeding, plumbers complete the installation of the plumbing fixtures, and electricians finish connecting circuits, receptacles, switches, light fixtures and smoke alarms. Connections to equipment such as furnaces, water heaters, mechanical ventilation systems and stoves are also performed at this time.

The final phase

Landscaping

This final stage includes finish grading, driveways, steps, walkways, groundcover, shrubs and trees. Carpentry work associated with decks and fences, and plumbing work for items such as underground sprinkler systems are also carried out at this time. Approximately one week is needed to carry out this final stage; however, the time will vary depending on the nature of the landscaping, and any special features such as decks and pools.

12

Your home awaits

Discover the possibilities with Bloomfield. Whether you are searching for a new development, custom home, or the finest builder to renovate the home of your dreams, we can’t wait to meet you.